The Friends' School Assembly Hall
| Client |
The Friends' School
|
| Architect |
IDW Architects |
| Value |
$6.2m (excl. GST) |
| Duration |
14 months |
| About |
The Friends' School's new auditorium building is
a state of the art meeting, entertainment, and
function centre. |
The Friends' School's new auditorium building is
a state of the art meeting, entertainment, and
function centre. The detailed and extensive external
landscaping ensures that this new addition to the
school's infrastructure compliments the existing
facilities on site.
The facility has been designed primarily to meet the
requirements of the performing arts faculties and
comprises recording rooms, practice rooms and a
large auditorium which seats over 800 guests. The
facility also boasts large foyer and gallery areas
which are used to display art work produced by
students, and a kitchen which can be used for on
site catering.
The most striking feature of the auditorium is the
impressive and vast hoop pine plywood-lined
curved ceiling which was produced in line with a
strict acoustic brief. The auditorium also boasts
a 350 seat retractable seating platform which at
the flick of a switch, can expand or retract within
30 minutes, giving greater flexibility to the useable
space of the building.
The mechanical heating system for the building is
connected to the reticulated natural gas supply
which ensures low operating costs and a reduction
in electricity consumption.
The external facade of the building is predominately
charcoal and off white precast concrete panels
including stainless steel and brass inserts. A large
feature of the external facade is the 150mm thick
Hebel panelling which also lines the rear wall of the
internal upper foyer. More subtly positioned but bold
in presence is the bright red Alucabond panelling
to each upper corner of the building.
|
 |