|
Page Seager, Hobart
A bespoke, architecturally
designed fit-out package for the second floor of the RACT building.
READ MORE >> |
|
The Hutchins School Library
The construction of the Hutchins School's new library learning centre and the demolition of the
existing library and adjacent class rooms.
READ MORE >> |
|
The Friends' School Assembly Hall
The Friends' School's new auditorium building is
a state of the art meeting, entertainment, and
function centre.
READ MORE >> |
|
Domain Tennis Centre, Hobart
Construction of a corporate stand and two admission stands at Hobart's premier Tennis facility.
READ MORE >> |
|
Aldersgate Village Units
Construction of architecturally designed units with a 6 star energy rating for social housing in Tasmania.
READ MORE >> |
|
Saffire Freycinet
Construction of an architecturally challenging, exclusive luxury resort which establishes a new standard in quality. The iconic Saffire resort is set in an ecologically sensitive area and incorporates numerous environmental protection measures and efficiencies..
READ MORE >> |
|
Cimitiere House
A five-storey 5 Green Star rated building set in the heart of Launceston, Cimitiere House sets a new standard in environmental and energy efficiency. Constructed using innovative building methodologies, this large structure was erected in just 6 months.
READ MORE >> |
|
Moorilla Pavilions
Construction of a cluster of architecturally and artistically unique boutique accommodation suites. An outstanding example of the high quality standards achievable.
READ MORE >> |
|
The Arts & Technology Facility, Assumption College
Construction of a state of the art learning centre incorporating numerous environmental efficiencies guaranteeing very low energy consumption.
READ MORE >> |
|
Girton Grammar Performing Arts Complex
Construction of a large performing arts complex and administration wing connected by an elevated walkway.
READ MORE >> |
|
|
|
|
|
|
|
188 Collins Street
The refurbishment of the existing plant room on level 14 of 188 Collins Street to create a
two level office space and the second stage involved the creation of a high quality office fitout for DIAC.
READ MORE >> |
|
|
|
|
|
|
|
|
|
|
|
|